Dolle Madrid Handrail Kit

£72.00
1 - 3 Days
Estimated Delivery 1 - 3 Days


A wooden handrail kit providing a safe and comfortable climb when being used with your existing Dolle Madrid Stair Kit.

 

Chat with us online now
 
£72.00

For international shipping, contact us to discuss your needs.

This Handrail Kit is ideal if you wish to fit an additional handrail to your existing Madrid staircase. It comes supplied with 3 uprights and a handrail section. The handrail section will need to be cut to measure the same length as your existing Madrid strings (refer to "Madrid Handrail Instructions" - Downloads section).

Madrid / Arundel Handrail - Technical Info
Model No: 59101
Brand: Dolle
Material: Spruce (pine)
Timber Thickness: 27mm
Handrail Length: 3340mm
Handrail & Uprights Width: 65mm
Uprights Length (3 No.): 1010mm



  
Free UK Mainland Delivery *

Within 1-3 working days, once the product has been despatched. Deliveries are usually made between 8:00am to 6:00pm Monday to Friday (excludes Bank Holidays).

Orders placed before 11:00am will be despatched the same day (stock dependent) for delivery the next working day.
When placing your order please provide a contact telephone number as this is a requirement of the specialist carrier we use.

Please read our full terms and conditions regarding the delivery procedure.


*
There will be an additional transport charge for making deliveries to the following post codes situated in the Highlands & Islands, Isle of Wight, Channel Islands, Isle of Man and Northern Ireland -

Post Code List
IV1, IV2, IV3, IV4, IV6, IV7, IV8, IV9, IV10, IV11, IV12, IV13, IV14, IV15, IV16, IV17, IV18, IV19, IV20, IV21, IV22, IV23, IV24, IV25, IV26, IV27, IV28, IV36, IV40, IV41, IV42, IV43, IV44, IV45, IV46, IV47, IV48, IV49, IV51, IV52, IV53, IV54, IV55, IV56, IV63
ZE1, ZE2, ZE3
TR21, TR22, TR23, TR24, TR25
PH19, PH20, PH21, PH22, PH23, PH24, PH25, PH26, PH30, PH31, PH32, PH33, PH34, PH35, PH36, PH37, PH38, PH39, PH40, PH41, PH42, PH43, PH44, PH49, PH50
PA20, PA36, PA38, PA39, PA40, PA41, PA42, PA43, PA44, PA45, PA46, PA47, PA48, PA49, PA50, PA60, PA61, PA62, PA63, PA64, PA65, PA66, PA67, PA68, PA69, PA70, PA71, PA72, PA73, PA74, PA75, PA76, PA77, PA78
KW1, KW2, KW3, KW5, KW6, KW7, KW8, KW9, KW10, KW11, KW12, KW13, KW14
KA27, KA28
HS1, HS2, HS3, HS4, HS5, HS6, HS7, HS8, HS9
PO30, PO31, PO32, PO33, PO34, PO35, PO36, PO37, PO38, PO39, PO40, PO41
GY, JY, IM, BT



You will not be able to place an order online if you require delivery to a post code (featured above).
Instead you will need to contact our Sales office on 01243 785 246 for the additional transport charge associated with delivering the product to your address.
A member of our Sales team will be able to take your order over the telephone and payment can be made via Debit or Credit card.
Once a product has been despatched the standard delivery timescale for Scottish Highlands & Islands, Northern Ireland, Isle of Man and the Channel Islands will be 3-5 working days.


For European or most Worldwide delivery destinations please email our Sales Office - sales@loftcentre.co.uk with your enquiry detailing the product you are interested in, together with your full delivery address and contact information.
We can then return a Quotation for the product and delivery costs once this has been sourced from the transport company.

Important - please read before purchase
It is your responsibility to ensure that any local authority approvals necessary have been obtained. This will vary according to your application and we advise you to always check before going ahead with a purchase.

Fixed Ladders, Space Savers, Spirals and Loft Stairs are covered in the building regulations and we recommend you confirm with the Local Building Control Department regarding their suitability for any project prior to specifying.

Therefore it is your responsibility to ensure that any local authority approvals necessary have been obtained. This will vary according to your application and we advise you to always check before going ahead with a purchase.

Many of our products have been widely used in the past in conjunction with Building Control, but the interpretation of the requirements for any particular situation remains solely with your Local Building Control Department.

^Top